The process of early development and construction of energy storage power station2024/1/25

Share to

In the new power system, energy storage, as a crucial part, is a necessary guarantee for the consumption of new energy and the security of the power grid. It has been widely applied on the power generation side, grid side, and consumption side. The construction of energy storage stations has achieved the sustainable development of new energy. The following is the process of the early development and construction of energy storage stations:

1Firstly, it is necessary to understand the nature and scale of the available land for energy storage projects. It is best to conduct on-site inspections to understand whether the on-site environment is suitable for configuring energy storage projects. It is also necessary to understand the configuration size of the distribution capacity in the project location, as well as relevant local policies.

2Secondly, it is necessary to understand the structure of the local power grid where the project is located, the difference in peak electricity prices, and the approximate annual electricity load of the project. It is necessary to verify the voltage level and connection interval of the access system. To accurately estimate the length of the transmission line and the corridor conditions for cable laying.

3Finally, it is necessary to understand the relevant policies of the local power grid company and commission a qualified local unit to conduct a feasibility study analysis. After the analysis, a project review should be conducted. If the project needs to be connected to the grid, it must be registered with the local county development and reform commission, and obtain the preliminary review opinions of the local provincial/autonomous region land and resources bureau for construction land, the preliminary review opinions of the local provincial power company project and power grid access, the preliminary review opinions of the local environmental protection bureau project construction, and the local urban construction bureau project site selection report. Understand whether there are subsidy policies for local energy storage projects.

In short, The early development and construction of energy storage power station are particularly crucial for the construction of the entire project, which directly affects the investment and operation of the entire project. The construction of energy storage power station is of great value for the development of new energy and the promotion of sustainable economic and social development.